S, M. and S.C, K. (2007) “Line Balancing and Performance Improvements: A Case Study of a Television Assembly Plant”, Malaysian Journal of Science, 26, pp. 125–137. Available at: https://samudera.um.edu.my/index.php/MJS/article/view/8735 (Accessed: 20 November 2024).